Title Icon Projects - PKOB WEGNER generalny wykonawca

BIOFUEL PRODUCTION HALL -„DESIGN AND BUILD” IN ŁOWYŃ

Location: ŁOWYŃ, WOJ. WIELKOPOLSKIE

Scope of work:

In Łowyń, a full-scale design project was implemented along with a comprehensive proces of the production hall – for the production of ecological fuels from straw together all together with the social and office part. The area covered was 2.92 ha, undeveloped and unarmed. The project has a usable area of 2201.60 m2 and a volume of 22483.91 m3, creating a coherent whole from both technological to the aesthetic point of view

THE GENERAL CONTRACTOR OF A BUSSINES & SPORTS HALL WITH THE PITCH

Location: GNIEZNO, WOJ. WIELKOPOLSKIE

Scope of work:

The sports and recreation hall is a 2-storey building with an area of about 1200m2. The building was constructed in an industrial style - raw walls, concrete blocks ceilings from compressed beams and pressed wood fillings, visible cable routes, roof construction - glued wood. Elevation - clinker combined with façade sheet and aluminum facade – in line with school build next to it.

DESIGN AND BUILD” IN GRODZISK WIELKOPOLSKI

Location: GRODZISK WIELKOPOLSKI, VOIVODESHIP GREATERPOLAND

Scope of work:

In Grodzisk Wielkopolski the building of the Independent Public Health Care Unit was built (construction of a new wing of the Hospital with the Outpatient Unit, Internistic Cardiology Department, Gynecology Ward, Obstetrics and Neonatology Department, Delivery Team and technical rooms, and expansion of the Department of Anaesthesiology and Intensive Care) rooms of the Operational Block and Department of Anaesthesiology and Intensive Care.